GIGW Compliance Before Go-Live.

The Guidelines for Indian Government Websites and apps are read as a style guide and enforced as a gate. One statement in the cybersecurity chapter decides whether a government site or application may be hosted in a production environment at all — and it is written in the past tense, which means the work has to be finished before the launch date, not scheduled around it.

The statement that gates everything: the site, app or portal has been security audited and an audit clearance certificate has been issued by NIC, STQC, an STQC-empanelled laboratory or a CERT-In-empanelled laboratory, before hosting in a production environment.

5.3.1the GIGW statement that gates production hosting
4bodies whose certificate satisfies it
88guideline statements across GIGW 3.0

Plain-English explainer · Written from the GIGW 3.0 manual and guidelines.india.gov.in · CERT-In Directions, 28 April 2022 · Sources read 18 September 2026

GIGW is the Guidelines for Indian Government Websites and Apps — the standard that governs Indian government websites, web portals, web applications and mobile apps across four focus areas: quality, accessibility, cybersecurity and lifecycle management. GIGW compliance means conformity with those guidelines, which in the current edition, GIGW 3.0, run to 88 numbered guideline statements.

Before go-live, GIGW compliance means one thing above all others: the website, web application, web portal or mobile app has been security audited and an audit clearance certificate has been issued by NIC, STQC, an STQC-empanelled laboratory or a CERT-In-empanelled laboratory, before it is hosted in a production environment. That is statement 5.3.1, the first of three statements in the cybersecurity chapter, and it is the reason a hosting provider asks for a certificate before it will accept a deployment. Three of the eighty-eight statements gate production hosting. The other eighty-five do not.

GIGW was formulated by the National Informatics Centre in 2009 and made part of the Central Secretariat Manual of Office Procedure by the Department of Administrative Reforms and Public Grievances. GIGW 2.0 followed in 2019. The current edition was formulated jointly with the Standardisation Testing and Quality Certification (STQC) Directorate of MeitY and the Indian Computer Emergency Response Team (CERT-In), and its cybersecurity chapter was formulated by CERT-In — as the guidelines’ own introduction records. The certificate that satisfies statement 5.3.1 is the artefact most people call a safe-to-host certificate. GIGW uses both names, calling it an audit clearance certificate in the statement and a “safe to host” certificate in its summary of what is new in 3.0.

Key Takeaways

  • GIGW is a gate, not a style guide. Three statements in its cybersecurity chapter decide whether a government site or app may be hosted in production at all, and the first is written in the past tense — so the audit, the remediation and the retest all precede the launch date.
  • It binds Central and State governments, district administrations and local governments, at any organisational level, and every website or app a government organisation owns — including ones a vendor built and runs.
  • Four bodies may issue the clearance: NIC, STQC, an STQC-empanelled laboratory, or a CERT-In-empanelled laboratory.
  • GIGW names ISO 27001, OWASP ASVS, OWASP Top 10 and CIS benchmarks — and names no ASVS level. A citizen-facing transactional government application should be scoped at ASVS Level 2. A scope of work that leaves the level blank transfers the choice to the tester.
  • The gate has a second half most departments miss. Statement 5.3.2 puts obligations on the government organisation itself: hosting inside India, DC/BCP/DR in high availability, annual DR drills, hardening with VA and PT, a deployed WAF, and 180-day log retention.
  • Accessibility runs in parallel, not afterwards: fifty statements at WCAG 2.1 Level AA, of which 49 evaluator actions name manual testing.
  • The certificate expires by event as well as by date — at least once in a year, or as and when any changes are done in the source code, whichever is earlier.
  • We deliver CERT-In audits, end to end, with our CERT-In empanelled partners. The safe-to-host audit behind a GIGW go-live is one of them.

A note on clause numbering and sources

Every statement number on this page — 5.1.1 to 5.1.25 for quality, 5.2.1 to 5.2.50 for accessibility, 5.3.1 to 5.3.3 for cybersecurity, 5.4.1 to 5.4.10 for lifecycle management — was read from chapter 5 of the GIGW 3.0 manual, which prints the number beside each statement, and the per-chapter counts were confirmed a second time by counting the statements published on the official guidelines index. One caveat worth carrying: the live cybersecurity chapter web page mis-numbers the third security statement as 5.3.2, so 5.3.2 appears twice there. The manual numbers it 5.3.3, and this page follows the manual. GIGW is a living document and its numbering has changed between editions, so before you cite a number in a tender response or an audit submission, open the current published text and confirm it. Quote the statement and treat the number as a pointer.

Applicability

Who GIGW applies to — ministries, states, PSUs and vendor-built sites

Most writing on this subject says “government organisation” and leaves it there, which is why state departments and public sector undertakings routinely assume the page is not about them. GIGW is explicit. Its scope and objective recommends the guidelines for Indian government websites and applications “at any organisational level and belonging to both Central Government as well as State Governments (including district administrations and local governments)”, says that all websites and apps owned by government organisations must comply, and recommends that browser-based intranet applications follow them too. The guidelines are circulated to all Indian government organisations at all levels.

BodyIn scopeWho plays the WIM roleTypical issuer route
Union ministry, department, attached or subordinate officeYes, at any organisational level — GIGW is circulated to all Indian government organisations, and DARPG made it part of the Central Secretariat Manual of Office Procedure.An officer not below the rank of Joint Secretary, which is the rank GIGW names. For an attached or subordinate office the parent ministry often nominates, or an officer of equivalent seniority is designated.Usually NIC, where the site is built or hosted inside the NIC estate.
State government departmentYes. The scope covers Central Government and State Governments expressly.Joint Secretary is a Union rank. In a state the equivalent is normally a Secretary, Special Secretary or Additional Secretary to the State Government, or a Director heading the department. GIGW does not resolve the equivalence, so the nominating authority does — settle it in writing.NIC state centre, or a CERT-In-empanelled laboratory the department procures.
District administration or local governmentYes. The scope names district administrations and local governments, including urban local bodies.Usually the District Magistrate or Collector, or a municipal Commissioner. The rank equivalence is a local determination and should be minuted.State NIC centre most often, because district sites commonly sit on state infrastructure.
PSU, CPSE or statutory bodyYes, as a government organisation. STQC also accepts private websites into its certification scheme, so a PSU has no ambiguity to shelter behind.A whole-time director or functional head of equivalent seniority. GIGW contemplates public sector organisations expressly, directing them to display their official logo where a Central ministry displays the State Emblem.Open-market procurement from a CERT-In-empanelled laboratory, because a PSU has its own procurement machinery.
Autonomous body, university or research instituteYes where the body is a government organisation. GIGW contemplates educational and research institutions by allowing edu.in, res.in or ac.in domains where they are eligible for gov.in.The Registrar, or a Dean or Director of equivalent standing.Open-market procurement, or the parent ministry route where the institute sits under one.
A site built and run by a vendorYes — the obligation follows ownership, not operation. All websites and apps owned by government organisations must comply, and the government organisation action sits on the department.The department nominates. A vendor cannot be the WIM. A vendor is the developer, and GIGW separates the two roles deliberately.Whatever the contract provides — but the organisation that built the application is not the ideal one to clear it.
An internal or intranet applicationRecommended rather than mandated: GIGW says browser-based intranet applications should also follow the guidelines. Statement 5.3.1, though, is written about hosting in a production environment, not about public reachability.The same WIM, because the policy set and the conformity file are departmental.Take the determination with the WIM and the hosting provider in writing — the provider is the party that will ask for a certificate.

One row is the source of more confusion than the rest. Statement 5.4.1 says the department must appoint a Web Information Manager who is a senior official not below the rank of a Joint Secretary. That is a Union rank. It does not exist in a state department, a municipal corporation or a PSU. GIGW publishes no equivalence table, so the nominating authority decides what “not below that rank” means in its own structure and minutes the decision — the evaluator interviews the WIM during the backend audit, and “we were not sure” does not survive that conversation.

What GIGW actually is

The four GIGW focus areas — one of them blocking

Every GIGW requirement has the same shape: a Statement of what must be true, the Benefit, and then separate actions for the government organisation, the developer and the evaluator — GIGW says so expressly, noting that government organisation actions are undertaken by the WIM. That structure tells you who owns each requirement before you start arguing about it. Read the statement to know what is required, and read the evaluator action to know how it will be checked.

Focus areaWhere it sitsWhat it coversHow it behaves at go-live
Quality5.1 — statements 5.1.1 to 5.1.25Association to government, ownership information, content currency, downloadable-material metadata, archival, contact and feedback, search, mobile responsiveness, the gov.in or nic.in domain requirement, and API integration with India Portal, DigiLocker, Aadhaar, single sign-on, MyGov and the data platform.Assessed against the Website Quality Manual and the live site. Quality defects rarely block hosting on their own, but they block the CQW certification the department is usually chasing next.
Accessibility5.2 — statements 5.2.1 to 5.2.50Fifty statements, each mapped one-to-one in the conformity matrix to a WCAG 2.1 success criterion from 1.1.1 through 4.1.3. GIGW 3.0 moved the baseline from WCAG 2.0 to Level AA of WCAG 2.1, adding seventeen new success criteria.Forty-nine of the fifty evaluator actions name manual testing. Tooling appears in eighteen and assistive technology in thirteen, always alongside manual testing and never instead of it.
Cybersecurity5.3 — statements 5.3.1 to 5.3.3Three statements, formulated by CERT-In. The first is the go-live gate: the security audit and the audit clearance certificate. The second covers the hosting environment. The third covers the Security Policy, Privacy Policy and Contingency Management Plan behind both.Three of the eighty-eight statements, and the only three a hosting provider enforces before it will accept a deployment. Everything else on this page is downstream of that arithmetic.
Lifecycle management5.4 — statements 5.4.1 to 5.4.10Nomination of a Web Information Manager, the ten-document policy set the WIM approves, hyperlink accuracy, content moderation, simultaneous multilingual updates, broken links, accessible document formats and bilingual delivery.Nothing here blocks a first deployment by itself, but 5.4.1 decides who is accountable for everything that does. A department without a nominated WIM has nobody empowered to approve the policies 5.3.3 and 5.4.3 require.

Eighty-eight statements, and three of them decide whether you can deploy. That imbalance is why a department reading GIGW cover to cover comes away with an impression of a design and content standard: eighty-five statements are about quality, accessibility and governance. The three in the cybersecurity chapter are the ones a hosting provider enforces. The manual also publishes Annexure II, a matrix to check conformity, running across all four chapters and mapping each guideline to the risk factors it addresses — which is the closest thing the document has to a submission format, and is worked through further down this page.

Say what you mean

GIGW and safe-to-host terminology — five terms that get confused

Most of the confusion in this area is vocabulary rather than substance. A procurement pack will use three names for one document and one name for three different obligations. These are the five terms worth fixing before a scope of work is written, because every one of them changes what somebody is expected to deliver.

TermWhat it means in the guidelinesWhat it means in practice
Audit clearance certificateGIGW’s own name for the artefact inside statement 5.3.1. The evaluator action for the same statement calls it a “valid security audit certificate”, so the guideline uses two names in two consecutive paragraphs.The document the hosting provider files. It certifies the tested build, not the organisation, and not the next build.
Safe-to-host certificateThe operational name for the same artefact. GIGW’s summary of what is new in 3.0 says government organisations must continue to obtain a “safe to host” certificate issued by the cybersecurity auditors empanelled by CERT-In/STQC or the auditors of STQC or NIC.Both names are live. Hosting forms tend to say safe-to-host, while the statement says audit clearance certificate. Expect both in one procurement pack.
CERT-In empanelmentAn issuer qualification, not a testing method. Statement 5.3.1 names a CERT-In-empanelled laboratory as one of four bodies, and the evaluator action repeats the same four.Empanelment is a status CERT-In grants an organisation, and the certificate is issued by that organisation. For Government and critical-sector audits the CERT-In auditor guidelines require manpower declared to CERT-In in the snapshot information form, which CERT-In may verify independently.
CQW / Website Quality CertificationA separate STQC scheme. The award of the mark “Certified Quality Website (CQW)” is a recognition that the website complies with the requirements of GIGW and that the organisation has adequate procedures and processes in place.Different artefact, different body, different validity. GIGW says the certification of cybersecurity aspects by STQC may be done on the basis of the safe-to-host certificate — so the clearance feeds CQW rather than replacing it.
Web Information Manager (WIM)Statement 5.4.1: the government organisation has nominated a WIM as defined in the guidelines. The government organisation action is explicit — a senior official not below the rank of a Joint Secretary.The WIM approves the ten-document set under 5.4.3 and is the signature that makes go-live a departmental decision rather than a vendor’s. GIGW also expects the evaluator to interview the WIM to assess awareness and competence.

The distinction that costs the most money is the last-but-one: a safe-to-host certificate and a CQW certificate are not the same document, do not come from the same body, and do not expire on the same schedule. The three-year certification sits on a security clearance that lapses after twelve months. For the boundary between the two, see safe-to-host versus a security audit certificate.

The gate itself

Reading GIGW statement 5.3.1 — one sentence, read slowly

Everything a department needs to plan is contained in the first statement of the cybersecurity chapter. It is worth reading as a lawyer would, one clause at a time, because each clause carries a scheduling consequence.

“Website, web application, web portal or mobile app have been Security Audited and an Audit Clearance certificate has been issued by NIC/ STQC/ STQC empanelled laboratory/CERT-In empanelled laboratory before hosting in production environment.”
GIGW 3.0, statement 5.3.1 — quoted in fullReproduced from guidelines.india.gov.in and the GIGW 3.0 manual, including its original spacing and capitalisation.

“Website, web application, web portal or mobile app”

Four kinds of thing, listed so that no one can argue a mobile app or a headless application sits outside. The scope question at go-live is never whether your artefact is one of these. It is which instances of them you are deploying. A portal with two sub-applications, a mobile app on two platforms, a partner API and an admin console is seven things to scope, not one, and every one of them is in production the moment it is reachable.

“have been Security Audited”

Past tense, and note what it does not say: not scanned, not reviewed, and no methodology named. The methodology comes from the chapter preamble — ISO 27001, OWASP ASVS, OWASP Top 10 and CIS benchmarks — and from the CERT-In auditor guidelines, which require industry-standard methodologies and state that solely tools-based testing should be discouraged. A scanner report is not an audit, and the people who read these certificates know the difference.

“and an Audit Clearance certificate has been issued”

Clearance, not assessment. Testing that ends with findings has not produced clearance. A certificate follows remediation and retest. This single word is why a realistic plan budgets three phases — test, fix, retest — and why the arithmetic that sinks go-live dates is a missing remediation window rather than a missing test window.

“by NIC/ STQC/ STQC empanelled laboratory/CERT-In empanelled laboratory”

A closed list of four, and the evaluator action for the same statement repeats it: the evaluator shall check that the website, web application, web portal or mobile app under evaluation has a valid security audit certificate issued by NIC, STQC, an STQC-empanelled laboratory or a CERT-In-empanelled laboratory, fulfilling CERT-In requirements. Anyone outside that list — an internal security team, a development partner, a general IT services firm, a consultancy without empanelment — can do excellent work and cannot issue the artefact. It is covered in more detail on who can issue safe-to-host certificates.

“before hosting in production environment”

The trigger is hosting in production, not public launch. A soft launch, a pilot with three districts, a demonstration to a minister or a “quiet” period before announcement is still hosted in a production environment. Departments that read this as “before we announce it” give themselves weeks of grace the statement does not offer.

“We will get the certificate after launch.”
— the sentence that turns a launch date into a hosting refusal
Who may issue it

Who can issue the certificate — four routes, four lead times

The four are equivalent for satisfying statement 5.3.1 and not equivalent for planning. No clearance timeline is published for any of them, so the useful comparison is not how long each takes but what drives the elapsed time and how much of it you control. On that test they rank in a stable order: a CERT-In-empanelled laboratory procured on the open market gives the department the most control, an STQC-empanelled laboratory under a rate contract slightly less, STQC itself less again because the security date depends on the assessment date, and NIC least, because allocation is not a departmental variable. Choose the route when the project plan is written. This is covered end to end on who can issue safe-to-host certificates, including how to check that an organisation’s empanelment is current.

IssuerWhat it isWhen departments use itWhat drives the elapsed time
NICThe National Informatics Centre’s own auditors.Sites built or hosted inside the NIC estate, where audit and hosting sit under one roof.Internal allocation. NIC serves government organisations across the country, so the variable the department controls least is when a slot opens — and the one it controls most is how early it asks.
STQCThe Standardisation Testing and Quality Certification Directorate of MeitY, in its own laboratories.Departments already inside the STQC certification path, where CQW is the destination.Certification sequencing. STQC’s CQW process places the security audit after a satisfactory website assessment, so the security date depends on the assessment date.
STQC-empanelled laboratory (SETL)A laboratory empanelled by STQC with scope for GIGW evaluation.Capacity relief where STQC’s own labs are committed, or procurement through a rate contract.Contract lead time — a purchase order where a rate contract exists, a full procurement where it does not. Confirm the empanelment is current and covers the work. STQC notes SETLs perform evaluation and do not issue the certificate.
CERT-In-empanelled laboratoryAn organisation empanelled by CERT-In for providing information security auditing services.Departments procuring on the open market with their own procurement machinery.Procurement plus the empanelment check. The department controls the most variables here — timing, scope and vendor — provided the empanelment is verified against CERT-In’s published list rather than a letterhead.

We deliver CERT-In audits

We deliver CERT-In audits, end to end, with our CERT-In empanelled partners. The safe-to-host audit a department needs before a GIGW go-live is one of them. See how a CERT-In audit runs with us.

One further constraint shapes how empanelled organisations may talk about themselves. The CERT-In auditor guidelines state that an auditor shall not use the CERT-In logo, nor make any reference to its association with CERT-In on any publicity or promotional material without CERT-In’s prior written permission — and that an auditor may use the words “This Organization is empanelled by CERT-In for providing information Security Auditing Service”, with no other words used without that permission. A vendor site carrying a CERT-In logo and a paragraph of creative phrasing about its association with CERT-In has told you how carefully it reads the guidelines it wants you to trust it with. The current list is published by CERT-In itself, and that is what to check against.

The attributes GIGW names

The security standards GIGW names — four standards, four jobs

The cybersecurity chapter does not leave “security audited” undefined. Its preamble says the government organisation will ensure and monitor that the host service provider and the developer adhere to industry best security practices and guidelines such as ISO 27001, OWASP ASVS, OWASP Top 10 vulnerabilities and CIS benchmarks. They are not alternatives. Each answers a different question, and a test plan that uses only one of them has a visible hole.

StandardThe job it doesWhere it shows up in the workHow a tester treats it
ISO 27001Management-system reference for the organisation running and hosting the site.Controls around the hosting environment and the department’s own operations — access control, logging and monitoring, change control, backup, supplier management, incident handling. It is the frame statements 5.3.2 and 5.3.3 sit inside.Not a pass/fail item on the application test plan. It shows up as evidence about how the environment is run, and is where a hosting provider’s own certification is usually cited.
OWASP ASVSVerification-requirement catalogue for the application itself.The structure of a competent test plan: authentication, session management, access control, input validation, cryptography, error handling, data protection, communications, business logic, files, API and configuration. ASVS requirements are levelled, and GIGW names ASVS without naming a level.The most useful of the four, because it converts “security audited” into an enumerable list a non-specialist can review before testing starts. GIGW’s government organisation action also names OWASP MAVS for mobile.
OWASP Top 10Awareness list of the most critical web application security risks.The coverage statement in the report, and the categories findings map to. GIGW’s government organisation action says the site should not have any security risks as identified by the latest OWASP Top 10 list.A floor, not a ceiling. A report that maps only to the Top 10 has demonstrated it looked for ten categories of risk. ASVS is what shows it worked through a requirement set.
CIS BenchmarksConfiguration baselines for the operating systems, web servers, databases and container platforms underneath.The hardening half of the work, mapping closely onto GIGW’s own system-administration attributes: ports closed by default, default and guest accounts removed, service banners suppressed, weak ciphers disabled, obsolete libraries replaced.The part departments most often leave out of scope, because it belongs to whoever administers the server. A configuration review benchmark by benchmark is the difference between a hardening claim and hardening evidence.

Alongside those four, statement 5.3.1 spells out its own developer actions — a secure-build checklist in two parts, worth reading in the original rather than in summary. The code half covers CMS, plugin and library currency. It covers salted-hash encryption of passwords, connection strings, tokens and keys, with nothing in plain text anywhere. And it covers custom error pages that never leak source, obscured HTTP response headers, secure HTTP-only cookies, captcha on login pages, directory traversal disabled, renamed default usernames and admin URLs, web-server processes running as a dedicated limited-privilege account, MFA, role-based access control, and input sanitised at both client and server, syntactically and semantically. The database half covers encryption at rest and in transit, salted hashing of stored passwords, default administrative passwords changed, TLS between web servers and databases, least privilege, surface-area reduction, audit trail logs, and backups kept off the website server. The item most often found open is stated plainly: access to the database only from the web server, on a whitelisted port, never assigned a publicly accessible IP. Every one of these is a configuration a tester can verify in an afternoon and a department can fix in a morning, which is why finding them in a clearance report is avoidable.

The half departments miss

GIGW hosting-environment requirements — your obligation, not the provider’s

Statement 5.3.2 says the hosting environment has been secured for confidentiality, integrity and availability — and the attributes below are filed under it as a government organisation action, introduced as “certain mandatory aspects to check for when choosing a hosting service provider”. That placement is the point: the department is answerable whoever operates the infrastructure. Most of these are configuration items, cheap to fix before testing and expensive to explain afterwards. The middle column reproduces the guideline’s own wording from the published cybersecurity chapter.

AttributeThe guideline’s own wordsWhat the evidence looks likeWhere it goes wrong
Hosting inside IndiaEnsure the hosting of the web infrastructure within geographical boundaries of India.A written statement naming the data-centre locations, plus the region and availability-zone configuration from the console rather than the contract.A managed service inside an Indian region that fails over to a foreign region, or a CDN, log-analytics or email-delivery dependency that lands data outside India while the application servers sit inside it.
DC, BCP and DR in high availabilityDepartment to ensure the HSP is providing DC, BCP and DR environments with state-of-the-art secure infrastructure configured in high availability (HA) mode.Architecture documentation showing the three environments, the replication between them, and what is configured for automatic failover rather than described as capable of it.A DR environment that exists as a contract line and an empty subscription. An environment nobody has ever cut over to is a plan, not an environment.
Annual DR drillConduct periodic drills of disaster recovery environment – at least once in a year.The drill record: date, scope, who ran it, what failed over, how long it took, what broke, what changed. A drill with no defect list tested the runbook, not the environment.For a first go-live there is no prior drill. Say so and state the scheduled date — a commitment with a date survives review, but silence does not.
Data-centre and physical controlsHSP to ensure that the servers are protected against environmental, physical and cyber threats, and that all security controls of the Data Center including physical security and appropriate access control mechanisms are implemented.The provider’s data-centre control documentation and any independent assurance it holds, plus the access arrangements for anyone who can reach the racks or the console.Accepting a provider certification as evidence about your own tenancy. Their certification covers their controls, but the configuration of your tenancy is still yours.
Hardening, VA and PTServers, Network devices used to host the website should be hardened with latest security patches and periodic Vulnerability Assessment (VA) and Penetration Testing (PT) followed by corrective actions.The hardening baseline, the configuration review against it, the VA scan with a run date and visible scope, the penetration-test report, and the closing retest.Findings without closure. The attribute says corrective actions — a VA report with forty open highs and no retest evidences that testing happened and remediation did not.
Web Application FirewallEnsure the HSP has deployed and configured a Web Application Firewall (WAF), which is hardened with latest security patches and is available for use by the department on demand.The rule set, the mode it runs in, the tuning for this application, the patch level, and — because the guideline says so — that it is available to the department on demand.A WAF in detection-only mode described as deployed. Also: a WAF treated as remediation. An input-validation defect mitigated by a WAF rule is still an input-validation defect.
180-day log retentionEnable and maintain logs of the ICT infrastructure for a rolling period of 180 days as per CERT-In directions.The retention configuration, the log sources feeding it, and the storage location — the Directions require these logs to be kept within Indian jurisdiction.The default retention of the managed log service, frequently 30 or 90 days. A configuration change rather than a project, which is why it is worth checking before testing starts.
Alert and log reviewRegularly monitor and conduct review of alerts and logs.Who reviews, how often, against what, and where the record lives. A named reviewer and a dated record beat any description of a capability.Collection mistaken for review. Shipping logs to a platform nobody opens satisfies the retention attribute and fails this one.
Transfer and host hygieneWeb host offer a Secure File Transfer Protocol (SFTP); FTP use by unknown users are disabled; It uses a rootkit scanner.Configuration showing SFTP on and plain FTP off, the file-transfer account list, and the rootkit scanner with its last run.A legacy content-upload workflow still using FTP because a content team has used it for years — usually discovered by the tester rather than declared by the department.
Container securityHSP should ensure to secure the containerized environments, if applicable.Base-image provenance and signing, registry access control, image scanning, orchestration RBAC, network policies, private subnets, a firewalled etcd cluster, key rotation and secret management — all of which GIGW spells out underneath this one line.Treating “if applicable” as optional. If the application runs in containers it is applicable, and a container estate assessed only through the application’s front door has not been assessed.

Underneath those, statement 5.3.2 carries its own developer action addressed to the system administrator or DevOps engineer rather than to the application developer, and it is essentially a CIS-shaped hardening list: least privilege on admin access, ports closed with deny-all by default, default and guest accounts removed, unused modules disabled, SFTP for file transfer, HTTP disabled in favour of HTTPS with HSTS, service banners configured so web server and OS type and version are not disclosed, the web-server configuration files protected — GIGW names .htaccess, nginx.conf and web.config by name — obsolete libraries and outdated protocols replaced, network segmentation, development environments isolated from production, a software change control system, and periodic secure configuration review. Two items are specific enough to quote: a valid SSL certificate is mandatory on all websites and must use at least 2048-bit SHA-256 encryption or higher, with expiry tracked, and the weak ciphers to disable are named — SSLv2, SSLv3, 3DES, RC4, TLS 1.0 and TLS 1.1.

The planning implication is obvious: a substantial part of what a safe-to-host engagement examines belongs to whoever administers the infrastructure, not to whoever wrote the application. In government work those are usually two organisations, so both need to be in the room when the scope is agreed and both need a named person who can make changes during remediation. The evaluator action for 5.3.2 is blunt: the evaluator shall check that the government organisation actions are being complied with. That check lands on the department.

The paperwork that is not paperwork

The GIGW policy pack — ten documents and one approver

Statement 5.3.3 asks that the website has the Security Policy, Privacy Policy and Contingency Management Plan clearly defined and approved by the government organisation. Statement 5.4.3 asks for a further set approved by the Web Information Manager — and the published list under 5.4.3 is ten documents, not seven, with the three security documents appearing in both places. The requirement in every case is approval, not authorship, and approval needs an approver: statement 5.4.1 asks the government organisation to appoint a WIM who must be a senior official not below the rank of a Joint Secretary.

DocumentWhere the requirement comes fromMinimum contentsWho approves, and what record proves it
Security PolicyStatement 5.3.3, approved by the government organisation. Also item 10 of the 5.4.3 set, approved by the WIM.Scope. Roles. Access control and privilege management. Password and MFA rules. Patching and change control. Logging, retention and review. Backup and restore. Vulnerability management including the audit cadence. Incident handling and the reporting route to CERT-In and NIC-CERT. Supplier obligations. The review cycle.The government organisation, with the WIM responsible for implementation across the lifecycle. The approval minute, plus the records the policy generates — access reviews, patch logs, change tickets, scan reports.
Privacy PolicyStatement 5.3.3 and 5.4.3 item 8. The 5.3.3 developer action requires citizen-facing policies — copyright, privacy, terms and conditions — to be published on the website.What personal data the application collects and where. The purpose for each. Who it is shared with. Retention. Cookies and analytics. The rights available and how to exercise them. The contact point for privacy queries.The government organisation, approved and then published. The published page, reconciled against a data inventory built from the application’s actual forms and integrations.
Contingency Management PlanStatement 5.3.3 and 5.4.3 item 9.Scenarios. Trigger and severity definitions. Roles and escalation path with names and out-of-hours contacts. Technical response per scenario. Reporting to CERT-In within six hours and to NIC-CERT for the NIC estate. Citizen communications. Recovery and DR invocation criteria. The review and drill cycle.The government organisation. The approved plan, the drill records, and the incident log — including a nil return, which is itself a record.
The 5.4.3 set — ten documentsStatement 5.4.3, approved by the WIM. The published list is ten documents, three of which are the same three 5.3.3 asks the government organisation to approve.Copyright Policy. Content Contribution, Moderation and Approval (CMAP) policy. Content Archival (CAP) policy. Content Review (CRP) policy. Hyperlinking Policy. Terms and Conditions. Website Monitoring Plan. Privacy Policy. Contingency Management Plan. Security Policy.The Web Information Manager. For each: the WIM’s approval, publication where citizen-facing, and the operational record the policy produces.

The 5.4.3 set, one row per document

Departments meet this set as a single table cell in a checklist and then discover it is ten separate approvals. The evaluator does not test whether the documents exist: it compares the policies in the Website Quality Manual against the website for consistency, then checks implementation by examining the records the implementation generates. Each document therefore needs an approval and an operational trace.

DocumentPublished or internalThe record that proves implementation
Copyright PolicyPublished — citizen-facing.Permission records for third-party content reproduced on the site.
Content Contribution, Moderation and Approval (CMAP)Internal.The CMS workflow history: who created, moderated and approved, and when. The evaluator checks randomly picked content against the policy.
Content Archival (CAP)Internal.Expiry dates on time-sensitive content, and the archive holding outdated tenders, notices and press releases.
Content Review (CRP)Internal.The review log behind the last-reviewed date the homepage displays.
Hyperlinking PolicyUsually published.Link-validation output and the external-link alert mechanism working on the live site.
Terms and ConditionsPublished — citizen-facing.The published page, consistent with what the application actually does.
Website Monitoring PlanInternal.Monitoring output: uptime, performance, broken-link runs, security alerts. A plan with no output has not been implemented.
Privacy PolicyPublished.Also required under 5.3.3. The data inventory behind it.
Contingency Management PlanInternal.Also required under 5.3.3. Drill records and the incident log.
Security PolicyInternal.Also required under 5.3.3. The audit cadence, patch and access records.

An illustrative Contingency Management Plan outline

  • 1. Scope and activation — which sites, apps, APIs and environments the plan covers, and what event activates it.
  • 2. Severity definitions — mapped against the reportable categories under the CERT-In Directions, so the six-hour clock is not a judgement call at 2 a.m.
  • 3. Roles and contacts — the WIM, the technical team, the hosting provider, the issuing organisation, communications. Names, numbers and an out-of-hours route for each.
  • 4. Reporting — CERT-In at incident@cert-in.org.in and 1800-11-4949, and NIC-CERT at incident@nic-cert.nic.in for the NIC estate, both named in GIGW’s own developer action under 5.3.1.
  • 5. Technical response per scenario — defacement, unauthorised access, data breach or leak, denial of service, provider outage, compromise of the CMS or a plugin.
  • 6. Recovery — DR invocation criteria, who authorises a cutover, the restore procedure, and the acceptance test that says recovery finished.
  • 7. Citizen communications — who speaks, through which channel, and what is said while the facts are incomplete.
  • 8. Review and drill cycle — including the annual DR drill the hosting attributes require, and the record each drill produces.

Illustrative, not a template. GIGW publishes no required structure for this document — only the requirement that the plan is clearly defined and approved and that the WIM ensures implementation across the lifecycle. The value is in the questions the outline forces before an incident, not the headings.

A policy is tested through the records it produces. A content approval policy is evidenced by approval records, and a monitoring plan by monitoring output. A policy that has never produced a record has never been implemented, and the evaluator action is written to notice.

Running in parallel

GIGW accessibility requirements — WCAG 2.1 Level AA, fifty statements

The accessibility duty on an Indian government website does not begin with GIGW. GIGW says its own basis includes ISO 23026, the W3C Web Content Accessibility Guidelines 2.1, the Rights of Persons with Disabilities Act, 2016 and the Information Technology Act, 2000 — so the accessibility chapter is the operational expression of a statutory expectation, not a design preference. GIGW 2.0 conformed to WCAG 2.0. GIGW 3.0 ensures conformity with Level AA of WCAG 2.1, and adds seventeen new success criteria aimed at users with cognitive or learning disabilities, users with low vision, and users with disabilities on mobile devices. Chapter 5.2 runs to fifty statements, 5.2.1 to 5.2.50, and Annexure II maps each one to a WCAG 2.1 success criterion from 1.1.1 through 4.1.3.

How it is evaluatedHow manyExamplesWhy
Manual testing alone29 of 50Whether instructions rely solely on sensory characteristics such as shape, colour, size or position (5.2.9, WCAG 1.3.3). Whether a reading sequence preserves meaning (5.2.8, WCAG 1.3.2). Whether link text describes its purpose (5.2.30, WCAG 2.4.4). Whether headings and labels describe topic or purpose (5.2.32, WCAG 2.4.6). Whether captions and audio description are genuinely equivalent (5.2.3–5.2.6, WCAG 1.2.2–1.2.5).These are judgements about meaning. No tool can decide whether alternative text serves the equivalent purpose.
Manual testing plus accessibility tooling18 of 50 name a toolContrast ratios of 4.5:1 for text and 3:1 for non-text content (5.2.14 and 5.2.18, WCAG 1.4.3 and 1.4.11). Markup validity with complete tags, correct nesting and unique IDs (5.2.48, WCAG 4.1.1). Programmatically determinable name, role and value (5.2.49, WCAG 4.1.2). Status messages exposed to assistive technology (5.2.50, WCAG 4.1.3). Resize and reflow (5.2.15, WCAG 1.4.4).A browser extension, plug-in or web accessibility tool finds the mechanical failures fast. GIGW names the tool alongside manual testing in every one of these, never instead of it.
Manual testing plus assistive technology13 of 50 name assistive technologyText alternatives for non-text content (5.2.1, WCAG 1.1.1). Information, structure and relationships conveyed by presentation (5.2.7, WCAG 1.3.1). Keyboard operation without a trap (WCAG 2.1.1 and 2.1.2). Focus visibility and focus order. Name, role and value exposure.A screen reader is the only way to observe what is actually announced — and this bucket often needs someone who uses assistive technology daily, not a tester who has installed one.
Tooling without an explicit manual step1 of 50The high-contrast-mode statement, where the evaluator action is written as checking whether high contrast mode is available, using an accessibility extension, plug-in or web accessibility tool.One statement out of fifty. The planning conclusion is the opposite of the one departments usually reach: an automated accessibility score covers almost none of the chapter.

Counts taken by reading all fifty evaluator actions as published on the official guidelines page. The buckets overlap where a statement names both a tool and assistive technology, which is why the tool and assistive-technology figures are given as “of 50” rather than summed.

What the evaluation report must contain

Four things, for the conformity file to hold: a result for every one of the fifty statements rather than a score, the method used for each (because GIGW specifies the method statement by statement), a defect list grouped to the templates and components that produce the defects rather than to the pages where they appear, and a retest result. GIGW names tooling by category rather than by product — an accessibility extension to the browser, an accessibility plug-in, a web accessibility tool, and assistive technology — and a department can run all four categories itself in an afternoon before commissioning anything. That will not clear the chapter, but it will tell you the size of the problem, which is what you need to decide when to start. If CQW is the destination, check STQC’s prerequisite for an IAAP-certified auditor review report before commissioning, because it constrains who may do the work.

Three consequences follow. Accessibility defects are usually template-level: one heading-structure error or one unlabelled control pattern repeats across every page built from the same component, so the defect count reads as enormous and the fix count is small — provided the fix lands in the component. Those fixes are code changes, and code changes made after a security audit has closed hit the on-change re-audit trigger under 5.3.1. And both workstreams end up in the same conformity matrix and the same certification file.

The sequencing rule worth carrying into the plan

Finish accessibility remediation before the security audit closes. Both sets of fixes are then inside one tested build, one retest clears both, and the certificate describes the code you are actually deploying. Run them sequentially and you pay for a second round of testing — in elapsed weeks, at the point in the project where weeks are most expensive.

The sequence

The GIGW go-live checklist — twelve steps a department can run

In the order that keeps the launch date. The first four are decisions, the middle five are work, and the last three are the handover. Nothing here is unusual. What is unusual is doing steps one to four at the start of the project rather than in the week the hosting provider asks for a certificate.

Name the WIM

Owner

Head of department

Output

The nomination order, and the WIM’s contact details ready to publish on the site.

Statement 5.4.1 requires a WIM not below the rank of a Joint Secretary, and the policies under 5.3.3 and 5.4.3 need an approver with authority. Leave this to the end and the person who must sign has never seen the site — and GIGW expects the evaluator to interview the WIM about their awareness and competence.

Freeze the scope

Owner

Project manager

Output

A written inventory: every hostname, mobile app identifier, API base path, admin interface and environment.

Build it from the DNS export and the load-balancer configuration, not from the project documentation. The certificate will name a scope, and an undeclared admin panel or an unlisted API is the commonest reason a cleared application is still exposed.

Choose the issuer route

Owner

Procurement, with the WIM

Output

A purchase order, an NIC request or an STQC application — dated.

The four routes are equivalent for satisfying statement 5.3.1 and not equivalent for planning: they differ in what drives the elapsed time and how much of it the department controls. This decision belongs in the project plan.

Agree the ASVS level and the test plan

Owner

Project manager and the issuing organisation

Output

A scope of work naming the ASVS version and level, the Top 10 coverage statement, and the CIS benchmarks in play.

GIGW names ISO 27001, OWASP ASVS, OWASP Top 10 and CIS benchmarks, and names no ASVS level. If the scope leaves the level blank, the tester picks one and the department pays for whichever it was.

Stand up a production-like staging environment

Owner

Infrastructure administrator

Output

A staging environment plus a written statement of how it differs from production, if it does.

The CERT-In auditor guidelines require the auditor to test on the staging or testing environment provided by the hosting service provider before issuing the certificate. A staging environment with a different build, configuration or stub integrations produces a certificate for a system that does not exist.

Harden in parallel, not afterwards

Owner

Infrastructure administrator

Output

A configuration-review result against the CIS benchmarks in use.

GIGW’s system-administration attributes are the checklist: ports closed by default, default and guest accounts removed, service banners suppressed, HTTPS with HSTS, weak ciphers off, development environments isolated from production, change control in place.

Close the configuration items before testing

Owner

Infrastructure administrator

Output

Screenshots or console exports of each setting, dated.

The cheap ones, done now rather than explained later: 180-day log retention within Indian jurisdiction, a WAF deployed, tuned and available on demand, SFTP on and plain FTP off, a valid SSL certificate at 2048-bit SHA-256 or higher with expiry tracked, and the database reachable only from the web server on a whitelisted port.

Run accessibility as its own workstream

Owner

Developer and accessibility evaluator

Output

A per-statement result across all fifty statements, with defects grouped to templates.

Forty-nine of the fifty evaluator actions name manual testing, so the schedule is driven by people rather than tooling. Accessibility defects are template-level and fix slowly, which is why starting alongside the security audit is the largest schedule saving available.

Approve the policy pack

Owner

WIM and the government organisation

Output

Ten approved documents, the citizen-facing ones published.

Statement 5.3.3 wants three documents approved by the government organisation, and 5.4.3 wants ten approved by the WIM. Approval is the requirement, not authorship, and the evaluator tests implementation by examining the records it generates.

Test, remediate, retest

Owner

The issuing organisation, then the department, then the issuing organisation

Output

The findings report, the remediation tracker, and the retest report.

The certificate follows the retest, not the first report. The CERT-In auditor guidelines expect the report to state closure timelines by severity — so an open high-severity finding is the reason clearance has not been issued.

Assemble the conformity file

Owner

Project manager

Output

The Website Quality Manual and a completed conformity matrix, guideline by guideline.

Annexure II of the GIGW manual runs across all four chapters, mapping each guideline to the risks it addresses. Filling in a conformity position while the testing is fresh turns the submission into an assembly job rather than an archaeology project.

Read the certificate, then go live

Owner

WIM

Output

The filed certificate, and the next audit trigger in the release process.

Check the scope, the URLs and app identifiers, the build tested, the issue date, the issuing organisation and the validity condition. Then open the post-launch clock: GIGW asks for periodic auditing at least once in a year or on any source-code change, whichever is earlier.

The step most often compressed is the fifth, and it is the one that cannot be. A staging environment that genuinely matches production — same build, configuration, integrations, TLS and WAF posture — is the precondition for a certificate that describes a real system. The CERT-In auditor guidelines require the auditor to test on the environment the hosting service provider supplies before issuing the certificate, and to state clearly which environment that was. A department that cannot provide it has not reached the point where testing is useful. For what happens when these steps are skipped, see why applications fail safe-to-host, and for the procurement view, how to get a safe-to-host certificate.

Not the only gate

Other gates that run alongside this one — and who governs each

A launch plan that only tracks the security audit will still miss a date, because several other things have to be true before a government site is live — and they are governed by different documents and different bodies. Knowing which is which is what stops a department asking its security auditor about a domain allotment.

A gov.in or nic.in domain

GIGW governs it. Statement 5.1.21 requires the website to be in the nic.in or gov.in domain. Educational, research and academic institutions eligible for gov.in may use edu.in, res.in or ac.in.

The government organisation action points at the .IN Registration policy and at registry.gov.in for the procedure. Allotment has its own lead time and it is not part of the security audit.

Where the site is hosted

GIGW governs the security of it — statement 5.3.2 — but not the choice of provider.

The choice itself runs through the department’s own procurement and, for cloud, through MeitY’s empanelment of cloud service providers. Confirm the current position with MeitY and your state IT department rather than from a vendor claim. What GIGW requires of you either way is that the infrastructure sits within the geographical boundaries of India.

Procuring the audit itself

Neither GIGW nor CERT-In governs this. Your own procurement rules do.

For the STQC route, charges are deposited in advance through the Bharatkosh portal, and STQC states that the security audit is charged separately from the website evaluation. For the CERT-In route it is an ordinary procurement against the empanelled list.

Two STQC prerequisites, if CQW is the destination

STQC governs both, separately from GIGW.

STQC’s scheme page publishes a notice making an IAAP-certified auditor review report a prerequisite for organisations applying for GIGW evaluation under the Website Quality Certification Scheme — read it before commissioning the accessibility work, because it constrains who may do it. STQC also notes that CERT-In-empanelled vendors need to register with STQC, so confirm your chosen organisation has done so.

The CERT-In Directions

Law, not a gate. They apply whether or not anyone asks for a certificate.

Clock synchronisation to NIC or NPL, six-hour incident reporting, a designated point of contact, and 180-day logs within Indian jurisdiction. One of them — the 180-day rule — is quoted inside GIGW’s hosting attributes, so it is a conformity item and a legal obligation at the same time.

The submission format

The GIGW conformity matrix — what a row actually holds

Annexure II of the GIGW 3.0 manual is titled “Matrix for checking conformity” and is published as a web page too. As published it is four tables — one per chapter — with three columns: a serial number, the guideline in shortened form, and “Risks Addressed”, carrying codes such as S1–S15 for the security chapter. That is the skeleton. A matrix that only restates the guidelines proves nothing: the row has to say what the position is and where the evidence lives.

A naming caution. GIGW’s Annexure II is the conformity matrix. Its Annexure I is the committee composition, Annexure III important terms, Annexure IV the role of the WIM. The CERT-In Directions have their own Annexure I — the twenty reportable incident categories — and their own Annexure II, the point-of-contact format. The two Annexure IIs are unrelated, and a conformity file citing “Annexure II” without naming the document invites exactly the question you do not want.

FieldWhy it is thereExample, filled from the worked example above
Guideline referenceIdentifies the statement precisely, so a reviewer is not matching on prose.5.3.1
Guideline statementThe statement as published, not a paraphrase. A paraphrase is where a conformity claim quietly narrows.Website, web application, web portal or mobile app have been Security Audited and an Audit Clearance certificate has been issued by NIC/ STQC/ STQC empanelled laboratory/CERT-In empanelled laboratory before hosting in production environment.
Applicable (Y/N) with reasonNot-applicable rows are where submissions get queried, so the reason has to stand on its own without a conversation.Y — the portal, two sub-applications, the partner API, the admin console and both mobile builds are all hosted in a production environment.
Conformance statusConformant, partially conformant or not conformant. Partial with a dated plan is a defensible answer. Silence is not.Conformant.
Evidence referenceA pointer into the file, so the reviewer can go straight to the artefact.EV-07: audit clearance certificate, EV-05: findings report, EV-06: retest report.
Responsible roleGIGW splits every statement between the government organisation, the developer and the evaluator. The matrix should carry the same split.Government organisation (WIM), with testing by the issuing organisation.
Risks addressedAnnexure II carries a risk-factor code against each guideline — S1–S15 for the security chapter — which is how the matrix ties conformity back to the risk it exists to mitigate.S1–S15.
RemarksWhere a scope boundary, a dated commitment or a known difference between staging and production gets recorded before anyone has to ask.Certificate scope covers all seven items in the inventory, and cms-preview was decommissioned before testing and is not in scope.

The rows that get queried: not-applicable

5.2.4 — audio description or media alternative for pre-recorded video in synchronised media

Applicable: N — the portal publishes no synchronised media. No audio or video content exists on any of the seven in-scope items at the date of assessment.

Remarks: Becomes applicable the moment a scheme explainer video is published. Flagged in the Content Contribution, Moderation and Approval policy so the check happens at publication rather than at the next audit.

Not-applicable rows are where submissions get queried, because a reviewer cannot see what is absent without being told. A reason plus a trigger for when it stops being absent is a complete answer. “N/A” alone is an invitation to a meeting.

Reading the certificate

Reading the audit clearance certificate — six checks before you file it

The certificate arrives, someone attaches it to a hosting request, and nobody reads it until there is a problem. These six checks take five minutes and catch every version of that problem.

  • 01 The issuing organisation, named in full, and its status: NIC, STQC, an STQC-empanelled laboratory, or an organisation empanelled by CERT-In. Check the empanelment against CERT-In’s own published list, not the letterhead.
  • 02 The scope, read against your inventory: every hostname, every mobile app identifier, every API base path, and the admin interfaces. What is missing from the scope line is live and uncertified.
  • 03 The environment tested, and the build, release or version identifier — matched to what you are about to deploy. A certificate whose scope names a staging hostname needs a sentence tying it to production.
  • 04 The issue date, against the date of the last significant server-side change. If a release landed after testing closed, the certificate predates the system.
  • 05 The validity condition on the face of the document — commonly one year from issue, or until a major change is made to server-side application code, whichever is earlier.
  • 06 That the findings it rests on are closed, and that the department holds the full report and not only the certificate. The hosting provider files the certificate. The department lives with the findings.

The fifth is the one that determines what happens next year, and it is covered in full on safe-to-host certificate validity. The practical version: put the issue date and the annual anniversary into the same calendar the department uses for its hosting renewals, and put the on-change trigger into the release process rather than into someone’s memory.

When it has to be done again

When a GIGW security audit must be repeated — three triggers, two calendar-free

GIGW states the re-audit rule inside statement 5.3.1 itself, as a developer action: conduct periodic auditing of the web application — at least once in a year or as and when any changes are done in the source code, whichever is earlier. Read the second limb first. It is an event trigger, and it fires regardless of how recently the last certificate was issued. The full treatment, including how the rule appears on the face of a certificate, is on safe-to-host certificate validity.

TriggerWhere it comes fromHow to read it
Changes to the source codeGIGW 5.3.1, developer action: conduct periodic auditing of the web application — at least once in a year or as and when any changes are done in the source code, whichever is earlier.An event trigger, not a calendar. A department that ships monthly cannot rely on an annual cycle. Agree in advance with the issuing organisation what counts as a change requiring re-testing, and write that definition into the release process so the decision is made by a rule rather than by whoever is on the release call.
The annual dateThe same clause at its outer bound: at least once in a year.The ceiling, not the plan. Certificates issued for government applications commonly carry the same condition on their face — one year, or until a major change is made to server-side application code, whichever is earlier. Read the certificate you actually hold rather than assuming twelve months.
New scope, new environment, updated componentsNot a code change, but it lands the same way. The certificate names what was tested, 5.3.2 attaches to the environment, and 5.3.1 asks that the CMS, third-party plugins and code are updated to the latest versions.A new module, integration or payment path is new scope and is uncertified whatever the certificate’s date says. A data-centre or cloud migration revalidates nothing automatically — the application may be unchanged while every configuration attribute is new. And updating a plugin changes what is running, which is the trigger departments most often argue about.

There is one more trigger that sits outside GIGW: an incident. The CERT-In Directions of 28 April 2022 require mandatory reporting of the listed incident types within six hours of noticing them. Reporting is the immediate obligation. Re-testing is the consequence, because an incident that produced a code or configuration change has produced a re-audit trigger as well.

Budgeting for it

What drives the cost of a GIGW security audit — seven variables, no price list

There is no published schedule of charges for a safe-to-host engagement, and a page that invented one would be worse than useless in a budget note. What can be stated honestly is what moves the number, because every one of these variables is visible before a quote is requested — and six of the seven are inside the department’s control. For the STQC route, note that STQC states the security audit is charged separately from the website evaluation and that evaluation charges are deposited in advance through the Bharatkosh portal.

DriverHow it moves the number
In-scope hostnames, applications and APIsThe largest single driver, and the one the department controls by writing the inventory honestly. Seven items is not one item, and a partner API still has to be enumerated endpoint by endpoint.
The ASVS level named in the scopeLevel 2 adds authorisation testing across roles and records, session and token handling and business-logic abuse over Level 1. Level 3 adds design review and source-code verification. Leaving the level blank transfers the choice rather than saving money.
Whether infrastructure configuration review is in scopeThe hosting-environment and system-administration attributes are a large body of work belonging to whoever administers the server. A scope covering only the application leaves the conformity file incomplete.
Mobile platform countEach platform is a separate binary with separate client-side storage, certificate handling and embedded secrets.
Retest roundsOne retest is normal and is what the certificate follows. A second usually means the remediation window was under-resourced, and it is paid for in elapsed weeks as well as fees.
Whether a production-like staging environment existsIf it does not, building one is project work that has to finish before testing can usefully start — and the auditor guidelines expect the auditor to test on the environment the hosting provider supplies.
Documentation quality at handoverAn API with published specifications, a role matrix and working test accounts tests faster and produces a stronger report for the same money than one the tester has to discover.
Four instruments, not one

The CERT-In Directions of 28 April 2022 — GIGW is a standard, these are law

A government department going live is standing inside four documents at once, and they do different kinds of work. Conflating them is how a department ends up satisfied that a certificate has discharged an obligation that was never about certificates.

InstrumentWho issued it, and whenWho it applies toHow it bites
GIGW 3.0NIC, 2009. Second version 2019. The third formulated jointly with the STQC Directorate of MeitY and CERT-In, its cybersecurity chapter by CERT-In. Adopted by DARPG into the Central Secretariat Manual of Office Procedure.Indian government websites, portals, web applications and mobile apps at any organisational level, Central and State, including district administrations and local governments.A conformity standard, assessed at go-live and carried through the lifecycle. Its cybersecurity chapter is where the production-hosting gate lives.
CERT-In Directions, 28 April 2022Issued under sub-section (6) of section 70B of the Information Technology Act, 2000, reference No. 20(3)/2022-CERT-In, effective 60 days after issue.Service providers, intermediaries, data centres, body corporate and Government organisations — so a government department is squarely inside the scope.A legal obligation with punitive consequences: non-compliance may invite punitive action under sub-section (7) of section 70B of the IT Act, 2000 and other laws as applicable.
CERT-In auditor guidelines, Version 3.0 (May 2018)Guidelines for CERT-In Empanelled Information Security Auditing Organizations. Version 3.0 of May 2018 is the version published at cert-in.org.in when this page was reviewed in September 2026.The empanelled organisation doing the testing — not the department being tested.Shapes what a competent engagement looks like from the other side of the table — the most useful document a department can read before writing a scope of work. GIGW adds that CERT-In advisories issued from time to time are updates to its cybersecurity chapter, so check for later guidance as well as a later version.
STQC Website Quality Certification (CQW)A certification scheme operated by the STQC Directorate, MeitY.Government and private website owners seeking formal recognition of GIGW conformity.Voluntary recognition rather than a hosting gate — but it consumes the security clearance as an input, so the two work in sequence.

The Directions of 28 April 2022 deserve a closer look: a government organisation is named in their scope, and one of their requirements is quoted directly inside GIGW’s hosting attributes. They were issued under sub-section (6) of section 70B of the Information Technology Act, 2000 and became effective sixty days after issue. CERT-In was appointed the national agency by notification dated 27 October 2009, and the rules governing its functions and duties were notified on 16 January 2014.

DirectionWhat it requiresWhat it means at go-live
Clock synchronisationConnect to the NTP Server of NIC or NPL, or to NTP servers traceable to these, for synchronisation of all ICT system clocks. Entities spanning multiple geographies may use another accurate and standard time source, but their time source shall not deviate from NPL and NIC.A configuration item, set before launch and evidenced from the server. It is also what makes every other log defensible: unsynchronised clocks across web, application and database tiers make an incident timeline unreconstructable.
6-hour incident reportingMandatorily report the cyber incidents listed in Annexure I to CERT-In within 6 hours of noticing such incidents or being brought to notice about such incidents. Channels: incident@cert-in.org.in, phone 1800-11-4949, fax 1800-11-6969.Not a control you build, a capability you staff. Six hours is a rota question before it is a technology question — and GIGW adds NIC-CERT at incident@nic-cert.nic.in as a parallel route for the NIC estate.
Point of contactDesignate a Point of Contact in the format at Annexure II of the Directions and keep the details current with CERT-In. CERT-In may order information up to and including near real-time, and failure to furnish it is treated as non-compliance.A named person with a working address, updated when they move on — the item most likely to be correct on the day of launch and wrong eighteen months later. Note that this Annexure II belongs to the Directions and is a contact form, while GIGW’s own Annexure II is the conformity matrix.
180-day logs in IndiaMandatorily enable logs of all ICT systems and maintain them securely for a rolling period of 180 days, maintained within the Indian jurisdiction.GIGW’s hosting-environment attributes incorporate this directly, so it is simultaneously a legal obligation and a GIGW conformity item. If you are procuring hosting, the Directions also put five-year subscriber-record obligations on your data-centre, cloud or VPS provider — a reasonable question to ask during procurement.

Annexure I of the Directions — the twenty reportable categories, in full

The six-hour clock only means something if the people on the rota can recognise a reportable incident without looking it up, so here is the list in full. For a public-facing government site the categories most likely to trigger first are (iv) defacement or intrusion with unauthorised changes, (iii) unauthorised access, (viii) denial of service, (x) attacks on e-governance applications, and (xi) and (xii) data breach and data leak. Category (xx) ties this hub to AI-specific testing: an AI or machine learning incident is already a mandatorily reportable class.

  • i. Targeted scanning or probing of critical networks and systems
  • ii. Compromise of critical systems or information
  • iii. Unauthorised access of IT systems or data
  • iv. Defacement of a website, or intrusion into a website and unauthorised changes such as inserting malicious code or links to external websites
  • v. Malicious code attacks — virus, worm, Trojan, bots, spyware, ransomware, cryptominers
  • vi. Attacks on servers such as database, mail and DNS, and on network devices such as routers
  • vii. Identity theft, spoofing and phishing attacks
  • viii. Denial of Service (DoS) and Distributed Denial of Service (DDoS) attacks
  • ix. Attacks on critical infrastructure, SCADA and operational technology systems, and wireless networks
  • x. Attacks on applications such as e-governance and e-commerce
  • xi. Data breach
  • xii. Data leak
  • xiii. Attacks on Internet of Things devices and associated systems, networks, software and servers
  • xiv. Attacks or incidents affecting digital payment systems
  • xv. Attacks through malicious mobile apps
  • xvi. Fake mobile apps
  • xvii. Unauthorised access to social media accounts
  • xviii. Attacks or malicious activity affecting cloud computing systems, servers, software and applications
  • xix. Attacks or malicious activity affecting systems related to big data, blockchain, virtual assets and exchanges, custodian wallets, robotics, 3D and 4D printing, additive manufacturing and drones
  • xx. Attacks or malicious activity affecting systems, servers, software and applications related to artificial intelligence and machine learning

Condensed from Annexure I of the CERT-In Directions dated 28 April 2022. Read the Direction itself before relying on a category boundary in an incident.

After the gate

STQC CQW certification — and how it consumes this work

Safe-to-host clearance lets you deploy. The STQC Website Quality Certification scheme is the separate, formal recognition that the site conforms to GIGW as a whole. The two are connected deliberately: GIGW’s introduction says the certification of cybersecurity aspects by STQC may be done on the basis of the safe-to-host certificate issued by the cybersecurity auditors empanelled by CERT-In or STQC, or by the auditors of STQC or NIC. Understanding that dependency is what stops a department paying for the same testing twice.

Two routes, chosen first

STQC publishes two paths: directly through STQC Labs, or through an STQC-empanelled laboratory (SETL) whose empanelment scope covers GIGW evaluation, in which case STQC Certification appoints a validator to supervise the SETL’s assessor. Either way STQC is explicit that STQC Labs and SETLs can only perform evaluation and shall not issue certificates — only the STQC Directorate at Electronics Niketan issues Website Quality Certificates, as per ISO/IEC 17025 and ISO/IEC 17065.

Application and Website Quality Manual

The application goes in with the website quality manual, VA reports of the application and database server, the network architecture, a recent security clearance report, details of the data centres, and the charges. That prerequisite list is the most useful part of the scheme for planning, because it is the evidence pack a department going live should be assembling anyway.

Adequacy review, then assessment

The assessor reviews the quality manual for adequacy and gives feedback. A manual describing policies the department has not approved fails here. The assessment team then evaluates the website using test tools and manually, and assesses back-end processes for compliance with the scheme requirements.

Security audit, then the certificate

After satisfactory assessment results, the security audit may be conducted through STQC, an STQC-empanelled lab, NIC or a CERT-In-empanelled organisation and submitted to STQC, which then issues the Certificate of Registration and the Certification Mark. STQC states the security audit is charged separately, and that CERT-In-empanelled vendors need to register with STQC.

Validity and surveillance

The certificate remains valid for three years with annual surveillance and surprise surveillance audit. Note the asymmetry: the CQW mark runs for three years while the security clearance behind it runs to the annual-or-on-source-change rule, so the security work recurs several times inside one certification cycle.

A department that builds the prerequisite file during the go-live project walks into certification with the submission already done. One that treats certification as a later project rebuilds it from memory. Two notices on STQC’s downloads list are worth opening before you plan the work: the transition plan for Website Quality Certification under GIGW 3.0, and the notice making an IAAP-certified auditor review report a prerequisite for GIGW evaluation under the scheme.

Scoping it in writing

Writing the GIGW security audit scope of work — what it should say

The highest-value hour in a safe-to-host project is the one spent writing down what is being tested, in enough detail that nobody can later disagree. The CERT-In auditor guidelines call this reducing or eliminating the expectation gap, and expect the deliverable structure to be agreed with the auditee before commencement.

Scope of the assessment

The assessment covers the public web application at [hostname], the citizen sub-applications at [hostname] and [hostname], the administrative console at [hostname], the REST interfaces published under [base path], and the Android and iOS builds of [app name], version [x.y.z]. Testing is performed against the staging environment at [hostname], which is configured identically to the intended production environment in build, operating system, web server, database, TLS configuration and web application firewall policy. Any component not listed above is outside the scope of this assessment and is not covered by any certificate issued on its completion.

Standards and method

Application testing follows the OWASP Application Security Verification Standard, version 5.0.0, at Level 2, this being a citizen-facing transactional application holding personal data — with coverage of the OWASP Top 10 risk categories stated in the report, and OWASP MAVS applied to the mobile builds. Infrastructure and platform configuration is reviewed against the applicable CIS Benchmarks for the operating system, web server, database and container platform in use. Testing is manual and tool-assisted. Tool output alone is not treated as a finding without verification.

Raise the level to 3 only where compromise carries national-security, life-safety or critical-infrastructure consequence — and expect it to bring design review and source-code-level verification with it. Drop to Level 1 only for a site with no authentication and no personal data. Name the ASVS version alongside the level, because the level definitions changed between ASVS 4.0.3 and 5.0.0.

Exclusions and safety

Denial-of-service and flood testing are excluded. Exploitation of findings that would risk service availability or data integrity is performed only with prior written approval and within an agreed window. Any tool installed in the environment is installed with the system administrator present, listed in the report, and removed on completion with the department’s acknowledgement.

Deliverables and closure

Deliverables are: a findings report with severity ratings and closure timelines by severity, a remediation tracker, a retest report covering every finding raised, and, on satisfactory retest, the audit clearance certificate naming the scope, the environment and the build tested. All assessment data is held on systems located in India, encrypted at rest, and destroyed on completion, with written confirmation to the department.

Illustrative wording, not a template to copy. Every engagement has its own scope, environment and constraints. The value is in the questions this forces you to answer before testing starts. The bracketed fields are where the real work is.

Failure modes

How a GIGW go-live slips — three failures specific to this gate

The technical reasons an application fails its testing are covered separately on why applications fail safe-to-host. These three are different: they are GIGW-specific, they are scheduling and accountability failures rather than defects, and each one is a decision taken early whose consequence arrives late.

The audit was scheduled after the launch date

Plan backwards from the launch, not forwards from the sprint plan. Statement 5.3.1 requires the audit to have happened and the certificate to have been issued before hosting in a production environment, and clearance follows three phases — test, remediate, retest — not one. The phase that gets compressed is remediation, and it is the phase that depends on the department’s own developers and infrastructure administrators rather than on the testing organisation.

The hosting environment was treated as the provider’s problem

Statement 5.3.2 is a government organisation action. The department is answerable for the hosting environment being secured, whoever operates it. Log retention, WAF posture, region configuration, DR drills and network exposure are departmental obligations discharged through a provider, not delegated away — and a provider’s own certification is evidence about the provider, not about your tenancy.

Policies exist as drafts, and no WIM has signed them

Approval is the requirement, not authorship. Statement 5.3.3 wants three documents approved by the government organisation, 5.4.3 wants ten approved by the WIM, and 5.4.1 wants a WIM not below the rank of a Joint Secretary. A well-written policy with no signature and no nominated WIM fails all three at once, and it fails them in a week when nobody has time to convene an approval.

References

Sources

Every GIGW, STQC and CERT-In statement on this page was read from the document below, not from a summary of it. All were read on 18 September 2026. The GIGW cybersecurity chapter carried a last-updated date of 8 September 2026 when read. The CERT-In auditor guidelines cited are Version 3.0 of May 2018, the version published at cert-in.org.in on that date — and GIGW itself says CERT-In advisories issued from time to time are to be treated as updates to its cybersecurity chapter, so check CERT-In’s publications for later guidance as well as for a later version of that document. Statement numbering follows the GIGW 3.0 manual. Confirm it against the current published text before citing it in a submission.

Frequently Asked Questions

What is GIGW compliance?
GIGW compliance means a government website, web portal, web application or mobile app conforms to the Guidelines for Indian Government Websites and Apps. GIGW was formulated by the National Informatics Centre in 2009 and made part of the Central Secretariat Manual of Office Procedure by DARPG. GIGW 2.0 followed in 2019, and GIGW 3.0 was issued jointly with the STQC Directorate of MeitY and CERT-In. It sets out 88 numbered guideline statements across four focus areas — quality (5.1.1 to 5.1.25), accessibility (5.2.1 to 5.2.50), cybersecurity (5.3.1 to 5.3.3) and lifecycle management (5.4.1 to 5.4.10) — each written as a Statement followed by separate actions for the government organisation, the developer and the evaluator. Formally, the phrase can also mean the department holds STQC’s Certified Quality Website (CQW) mark.
Does GIGW apply to state government websites and PSUs?
Yes. GIGW’s scope covers Indian government websites and applications at any organisational level, belonging to both Central Government and State Governments, including district administrations and local governments, and says all websites and apps owned by government organisations must comply. Public sector organisations and autonomous bodies are contemplated expressly. The one point GIGW does not resolve for non-Union bodies is the Web Information Manager rank: it requires a senior official not below the rank of a Joint Secretary, which is a Union rank. A state department, municipal corporation or PSU must determine its own equivalent and minute that determination, because the evaluator interviews the WIM during the backend audit.
What does GIGW require before a government website goes live?
Statement 5.3.1 is the gate: the website, web application, web portal or mobile app has been security audited and an audit clearance certificate has been issued by NIC, STQC, an STQC-empanelled laboratory or a CERT-In-empanelled laboratory, before hosting in a production environment. Two further statements travel with it — 5.3.2, the hosting environment must be secured for confidentiality, integrity and availability, carrying attributes such as hosting inside India, DC/BCP/DR in high availability, an annual DR drill, hardening with VA and PT, a deployed WAF and 180-day log retention. The other is 5.3.3, a Security Policy, Privacy Policy and Contingency Management Plan defined and approved by the government organisation.
Who can issue the GIGW security audit clearance certificate?
Four bodies, named in statement 5.3.1: NIC, STQC, an STQC-empanelled laboratory, or a CERT-In-empanelled laboratory. The evaluator action repeats the four and adds that the certificate must fulfil CERT-In requirements. GIGW’s operational summary says the same — government organisations must continue to obtain a safe-to-host certificate issued by the cybersecurity auditors empanelled by CERT-In/STQC or the auditors of STQC or NIC. Empanelment is a status held by an organisation rather than an individual tester, and the certificate is issued by that organisation. For Government and critical-sector audits the CERT-In auditor guidelines require manpower declared to CERT-In, which CERT-In may verify independently — so ask who will be on the team, and check the empanelment against CERT-In’s own published list.
Which security standards does GIGW reference, and at what ASVS level?
The cybersecurity chapter preamble names four: ISO 27001, OWASP ASVS, OWASP Top 10 vulnerabilities and CIS benchmarks. ISO 27001 frames how the organisation and hosting environment are managed. ASVS supplies the verification requirements that turn “security audited” into a reviewable test plan. The Top 10 supplies the risk categories findings map to, and CIS benchmarks supply the configuration baselines underneath. GIGW also names OWASP MAVS for mobile. GIGW names ASVS without naming a level, so the level is the department’s decision: a citizen-facing transactional application holding personal data should be scoped at Level 2, an informational site with no authentication at Level 1, and Level 3 where compromise carries national-security, life-safety or critical-infrastructure consequence. Name the ASVS version too — the level definitions changed between 4.0.3 and 5.0.0.
How long is a GIGW security audit certificate valid?
GIGW states the rule as a developer action inside statement 5.3.1: conduct periodic auditing of the web application at least once in a year, or as and when any changes are done in the source code, whichever is earlier. Certificates issued for government applications commonly carry the same condition on their face. Read the second limb as the operative one: a certificate issued last month does not cover a build shipped this month. Two things also sit outside the code-change limb — new scope, such as a payment path added to a cleared application, and an infrastructure migration, which changes every configuration attribute under 5.3.2 while leaving the application untouched.
What changed between GIGW 2.0 and GIGW 3.0?
Four things matter for a go-live. A cybersecurity chapter was added, formulated by CERT-In — GIGW 2.0 had no equivalent, which is why older checklists do not mention the audit clearance certificate at all. Accessibility moved from WCAG 2.0 to Level AA of WCAG 2.1, adding seventeen new success criteria. The guidelines were restructured so every statement carries separate government organisation, developer and evaluator actions. And mobile apps and public digital infrastructure integration — India Portal, DigiLocker, Aadhaar, single sign-on, MyGov, the data platform — were brought in properly. GIGW 3.0 also says CERT-In advisories issued from time to time are updates to its cybersecurity chapter, so that chapter is not a fixed text.
Do the CERT-In Directions of 2022 apply to a government department?
Yes. The Directions issued on 28 April 2022 under sub-section (6) of section 70B of the Information Technology Act, 2000 name service providers, intermediaries, data centres, body corporate and Government organisations. Four obligations land on a go-live plan: synchronise all ICT system clocks to the NTP servers of NIC or NPL (or servers traceable to them), report the incidents listed in Annexure I within 6 hours of noticing them or being brought to notice of them, designate and maintain a point of contact in the format at Annexure II of the Directions, and enable logs of all ICT systems and maintain them securely for a rolling period of 180 days within Indian jurisdiction. Non-compliance may invite punitive action under sub-section (7) of section 70B.
Can our development vendor do the GIGW security audit?
Only if that vendor is itself one of the four issuers named in statement 5.3.1, because the certificate has to come from NIC, STQC, an STQC-empanelled laboratory or a CERT-In-empanelled laboratory. Two further points belong in procurement. The CERT-In auditor guidelines require that for Government and critical-sector audits the empanelled organisation deploys manpower declared to CERT-In, and CERT-In may verify that independently — so ask who will actually perform the work. And independence is a separate question from empanelment: the organisation that built the application is not the ideal organisation to clear it, whatever its status.
What does the hosting provider actually ask for at submission?
The certificate, and then the things the certificate implies: the audit clearance or safe-to-host certificate naming the scope and the issuing organisation, the hostnames and app identifiers you intend to host (which must reconcile with that scope), the build or version identifier, and the validity condition. Where the hosting provider carries the 5.3.2 attributes on your behalf, the conversation runs the other way too — your region and data-centre configuration, the DC/BCP/DR arrangement, the WAF posture, and the 180-day log retention setting within Indian jurisdiction.
Can the GIGW security audit be done remotely?
Nothing in GIGW requires an on-site engagement, and application-layer testing against a staging environment is ordinarily performed remotely. Three constraints shape it. The CERT-In auditor guidelines require the auditor to test on the staging server or testing environment provided by the hosting service provider before issuing the certificate, and to state clearly the environment tested. Tool installation is expected to happen with the auditee system administrator present, with tools listed and removed afterwards. And auditee data must be stored only on systems located in India, encrypted on auditor laptops and wiped after completion, with no mirroring outside the country and no sharing with an overseas partner unless specifically authorised.
What does a GIGW security audit cost?
There is no published schedule of charges, and any figure quoted without a scope is a guess. What can be stated is what moves the number, and most of it is inside the department’s control: the number of in-scope hostnames, applications and APIs, the ASVS level named in the scope of work, whether infrastructure configuration review is in scope as well as the application, how many mobile platforms ship, how many retest rounds the remediation window needs, whether a production-like staging environment already exists, and how good the documentation is at handover. For the STQC route, STQC states the security audit is charged separately from the website evaluation and that evaluation charges are deposited in advance through the Bharatkosh portal.
What is the difference between GIGW compliance and CQW certification?
GIGW is the standard. CQW is a certification against it, operated by the STQC Directorate. The award of the mark “Certified Quality Website” recognises that the website complies with the requirements of GIGW and that the organisation has adequate procedures and processes in place. The published process runs from an application with the website quality manual, VA reports for the application and database server, the network architecture, a recent security clearance report and details of the data centres, through an adequacy review and assessment of the website and back-end processes, to a security audit through STQC, an STQC-empanelled lab, NIC or a CERT-In-empanelled organisation. STQC notes its labs perform evaluation only — the STQC Directorate issues the certificate. It remains valid for three years with annual surveillance and surprise surveillance audit, while the security audit behind it recurs annually or on source-code change.
What happens if a government website goes live without the certificate?
Two consequences. Procedurally, the certificate is what a hosting provider asks for, so a department that cannot produce it is asking the provider to accept a deployment GIGW says should not be hosted yet — how that ends depends on the provider and the department rather than on a published rule. Materially, an untested production application carries whatever it carries, and several reportable categories under the CERT-In Directions describe what tends to happen to an unhardened public government site: defacement or intrusion with unauthorised changes, unauthorised access, data breach and data leak, each with a six-hour reporting clock. If an application is already live without clearance, commission the audit immediately, close anything the first pass finds exposed, complete remediation, retest, obtain the certificate, then regularise the file.
How long does GIGW go-live clearance take?
There is no published timeline for any of the four issuer routes, and any specific number is a capacity estimate rather than a rule. Three drivers dominate the date, and the department controls two. First, the issuer route: allocation inside NIC is not a departmental variable, whereas an open-market procurement from a CERT-In-empanelled organisation is. Second, the remediation window, which depends on the department’s own developers and infrastructure administrators — and which is routinely under-planned, because clearance follows three phases, test then remediate then retest, not one. Third, whether accessibility remediation runs in parallel with the security work or waits until it closes.

Written By Expert Auditors

Surendra Pal SinghChief Information Security Officer & Data Protection OfficerCISODPOCISAMCSEITILISO 27001 Lead AuditorISO 27701 Lead AuditorISO 42001 Lead Auditor
Saundhi ChauhanLead AuditorISO 27001 Lead AuditorISO 27701 Lead AuditorISO 42001 Lead Auditor
Last reviewed: September 2026 • Content verified by certified lead auditors

Get in touch

Book a free consultation or send us your requirements. We respond within 24 hours.

Send us your requirement.

01Your details
02What is it about?
VAPT
03Send
Asking about: VAPT